H
  • How does the adapter scheme affect my overall costs for the unit?


  • Costs are reduced in several different ways. First, separate adapters for Channel, Permanent Link and Calibration are no longer required. Second when plugs on the Permanent Lead testing patchcords start to wear, the adapter/cord units does not have to be replaced. Simply put in new patchcords, recalibrate and continue testing.



Newsletter
lantek field cal button english